91 Survey number


Each time (date) and fencing situation (inside, outside), that an assessment of ground vegetation is made on a given subplot (coded by the sample_ID), a survey number is given (identical on both PLV and VEM forms).

By combining the plot number with the sample_ID and the survey number a unique plot/survey number is created.

Example: A spring and a summer assessment on a subplot should be submitted as follows

FORM: PLV

Sequence country plot sample_ID team_ID no_members survey_type survey_nr date
0001 04 0001 01 01 2 1 01 250312
0002 04 0001 01 01 2 1 02 140612