SI - System Installation
Form: PLT - Contents of file with the information on Plot level, Level II
Form introduced: 2000
Last change: 2011
!Sequence; country; plot; latitude; longitude; altitude_m; altitude; plot_design; orientation; slope; relocated_plot; date_installation; plot_size; other_observations
POSITION | FIELD | DESCRIPTION |
---|---|---|
1 | Sequence |
Description: Continuous number to identify the line of the submitted file Format: I |
2 | country M K |
DB Column: code_country Description: ID of the country Format: I Dictionary: d_country |
3 | plot M K |
DB Column: code_plot Description: Observation plot number Remarks: A unique number (per country) given to the permanent plot during the selection or installation Format: I |
4 | latitude (+DDMMSS) M |
Description: Latitude in Degrees Minutes Seconds (WGS84) Remarks: E.g. ‘+505852’ = 50 Degree, 58 Minutes, 52 Seconds Format: C Explanatory Item: 4 |
5 | longitude (+/-DDMMSS) M |
Description: Longitude in Degrees Minutes Seconds (WGS84) Remarks: E.g. ‘+035531’ = 3 Degree, 55 Minutes, 31 Seconds Format: C Explanatory Item: 4 |
6 | altitude_m (m) |
Description: Altitude Format: I Introduced: 2011 |
7 | altitude (m) M |
DB Column: code_altitude Description: Altitude above sea level in 50 meter classes Format: I Dictionary: d_altitude |
8 | plot_design M |
DB Column: code_plot_design Description: Plot design Format: I Dictionary: d_plot_design Explanatory Item: 5 Introduced: 2011 |
9 | orientation M |
DB Column: code_orientation Description: Coded orientation of the plot Format: I Dictionary: d_orientation |
10 | slope (degree) M |
Description: Slope of the plot Format: I Introduced: 2011 |
11 | relocated_plot |
Description: Number of the replaced plot in case of replacement installation Remarks: e.g. plot number 33 has been destroyed by a storm, then the replacement plot (number 100) needs to have value 33 in ‘relocated_plot’ Format: I Introduced: 2011 |
12 | date_installation (DDMMYY) M |
DB Column: date_install Description: Installation date Remarks: E.g. ‘9th October 2012’ = ‘091012’ Format: Date |
13 | plot_size (ha) M |
Description: Plot area, at least 0,25 ha, does not include the area of the buffer zone Format: F Explanatory Item: 39 |
14 | other_observations (FREE TEXT) |
DB Column: other_obs Description: Supplementary comments Format: C |